Skip to content

OPS-19: hosted data reset, verified, and the API and web deployed from master - #64

Merged
pratyush1712 merged 1 commit into
masterfrom
pilot/G-OPS-19
Nov 9, 2026
Merged

pratyush1712 merged 1 commit into
masterfrom
pilot/G-OPS-19

Conversation

@pratyush1712

@pratyush1712 pratyush1712 commented Nov 9, 2026 •

Copy link
Copy Markdown
Member

Summary

This PR marks OPS-19 done. It changes plan text only.

Rehearsal. The reset was first rehearsed on the local stack through the CLI's remote-reset path (db reset --db-url … --no-seed). It showed that:

  • every migration applies, including the schema-2 migration and DB-20;
  • the reset also deletes Auth accounts;
  • the fieldmaps_* roles and the API role's password are kept;
  • Storage is untouched; the app keeps packages in Postgres.

What the owner did and checked.

  • Ran supabase db reset --linked --no-seed on DECA Mark GIS.
  • Ran database/hosted/verify.sql, which printed "Hosted assertions passed".
  • Checked that Vercel's production deployment matches.
  • Checked that the testers have new accounts.
  • Checked on a phone that a new account sees Training, downloads Practice garden and uploads a record.

What the orchestrator checked, read-only.

  • Hosted migration history lists all eight migrations, through 20261028090000_training_seed_and_form_templates.
  • The API answers /ready.
  • The API's /v1/form-templates route answers 401. That route was added in BE-25, so Render runs current master.

Effect on deploys. This was the first API deploy since BE-24, so D36's window has ended. docs/plan/pilot-readiness.md now says that commits to master no longer need [skip render], and that Render deploys master's head again as usual. This PR's title leaves the tag out on purpose.

What's left before launch. OPS-19 and OPS-20 are done, so QA-08's dependencies are all met. QA-08 itself, on one iPhone and one Android tablet (D37), is the remaining launch gate.

Verification

pnpm plan:check passes. No code changed.

Device check pending (owner)

None for this record. QA-08 is next.

Owner steps

None.


Generated by Claude Code

RetriggerView in GreptileConfidence Score: 5/5

This documentation-only PR appears safe to merge.

Summary

Records OPS-19 as complete after the hosted reset and deployment checks.

  • The hosted reset is done, and Render deploys master again.

No actionable issues found. No scripts or hosted checks were run during this review.

Reviews (1) · Last reviewed commit: "OPS-19: hosted data reset, verified, and..." · Reviewed by Greptile

…m master

The owner reset DECA Mark GIS with supabase db reset --linked --no-seed after a local rehearsal of the same CLI path; verify.sql passed, all eight migrations are recorded, the API answers /ready and runs current master (the BE-25 route answers 401), Vercel matches, testers have new accounts, and a new account on a phone downloaded Training's Practice garden and uploaded a record. OPS-19 is done and D36's window has ended: commits to master no longer need [skip render]. Plan text only. Verified: plan:check passed.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01WZcT2HQ7XezNWGzBzzdjrU
@vercel

vercel Bot commented Nov 9, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
deca-mark Ready Ready Preview Nov 9, 2026 10:42pm UTC

@pratyush1712
pratyush1712 merged commit 84f8841 into master Nov 9, 2026
10 checks passed
@pratyush1712
pratyush1712 deleted the pilot/G-OPS-19 branch November 9, 2026 22:42

This branch was successfully deployed

1 active deployment
Preview — d7570b12 Deployed Nov 9, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants